Site-96 Closure Log
All procedures related to the termination of Site-96 have been concluded. The following report outlines the outcome of the process.
Staff were extracted from the site concurrent with the activation of the shutdown sequence.
A comprehensive survey of the site revealed undetectable collateral impact